Case Study
Dilling Group provided mechanical (plumbing) and electrical services to build this new manufacturing facility completed in 2022. Â
Case Study
Scope:Â We self-performed installation of: chilled water, heating water piping, chiller(s), boiler(s), pumps, RO systems, steam generators, AHUs, ductwork, VAV boxes, grilles, plumbing piping (sanitary, vent, storm drainage, domestic hot and cold water).